Load bank synchronization
We synchronize load banks when we need more load power and it is necessary to control them with one device. For this purpose, the remote control is used for synchronization. It has special software that allows to control up to 9 devices at the same time. The panel also has an emergency stop, which immediately stops all connected load banks. The devices are connected via a synchronization cable with a plug that fits into the socket on the control panel.